Make It Yours.

 

Design and construction, like manufacturing, is best left to the pros. From handicraft to high-tech fabrication, CME has a wide range of integrated capabilities to boost your facilities efficiency - and profit.

In other words, we make it right the first time.

QA LAB
MUNICIPAL WASTE WATER
CITY OF FORT WAYNE HEADWORKS AND CLARIFIERS - ARCHITECTURAL DESIGN IN COORDINATION WITH DONAHUE ENGINEERING
VAR/SPECIALTY FURNACE
VAR FURNACE PITS, BLAST PORTS, ENCLOSURE, BRIDGE CRANE & STRUCTURAL
GALVANIZING
SMALL PARTS LINE
ELRINGKLINGER
THIS CME INTEGRATED DELIVERY DESIGN BUILD PROJECT COMPLETED A CUSTOM BUILD IN OUR CLASS A SPEC BUILDING WITH A 30 FOOT CLEAR HEIGHT FOR ELRINGKLINGER A GERMANY BASED AUTO PARTS MANUFACTURER. SPECIALTY PRESS PITS AND A TWO STORY OFFICE BUILD-OUT ARE PROJECT HIGHLIGHTS
FABRICATION/ASSEMBLY
2 ADDITIONS FOR A PROCESS MECHANICAL CONTRACTOR
IMPLANTS/INSTRUMENTS
AVALIGN INSTRUMENTS AND IMPLANTS - PRODUCTION FACILITY, R&D OFFICES, Q&A LAB, EMPLOYEE HEALTH & WELLFARE
CME HAS DONE 2 ADDITIONS TO THE ORIGINAL BUILDING AS WELL AS WORK AT A SECOND LOCATION
PRIVATE WASTEWATER
EXPERIENCED IN WASTE WATER CONSTRUCTION AND FACILITY DESIGN IN CONJUNCTION W/ WASTEWATER ENGINEERING CONSULTANTS
FASTENAL
DESIGN BUILD PROJECT FOR MARKAR DEVELOPMENT TO HOUSE FASTENAL'S NEWLY CONSOLIDATED FORT WAYNE OPERATIONS
SUMMIT FOUNDRY SYSTEMS
DESIGNED AND BUILT ORIGINAL BUILDING AND SUBSEQUENT ADDITION TO MORE THAN DOUBLE EXISTING PRODUCTION SPACE
AUTOMOTIVE
NISCO NISHIKAWA COOPER STANDARD AUTOMOTIVE TIER ONE SEALS MANUFACTURER
HEAT RECOVERY SYSTEM
DOCUMENTATION OF EXISTING AND DETAILED PLANS FOR MODIFICATIONS TO INDUSTRIAL HEAT RECOVERY SYSTEM
MEDICAL PLASTICS
MEDICAL PLASTICS BLENDING - HAZARDOUS OCCUPANCY